Procter Hug High School

  • Procter R. Hug High School is under construction! The new school is scheduled to open in the Fall of 2022.

    This is an exciting project that will bring the first new high school to our district in nearly two decades and will provide a state-of-the-art education space to our students. The new 295,000 square foot, three-story building will include 40 general learning rooms, 11 science labs, 15 shared group rooms, 17 specialized labs for art, media, and career tech, a student commons, a 425-seat performing arts center, music suits, 2 gymnasiums, and a JROTC room.

    The new high school will replace the current, aging Procter Hug High School and all students currently zoned for Procter Hug will attend the new school once it opens. With a capacity for 2,200 students, the school will also help to relieve overcrowding at Spanish Springs High School, the District's most overcrowded facility. Follow the Zoning Advisory Committee and the Board of Trustees for updates about the zoning for the new school. 

    For construction related updates sent to your inbox, sign up for our email list.    

    For questions or concerns about construction related matters only, please call the Clark/Sullivan construction hotline at 775-321-5714.  

  • Road Construction Update April 2021 to October 2021

    As part of the construction of the new Procter R. Hug High School, our contractors will be making safety improvements to Sullivan Lane. This will result in the closure of a part of Sullivan Lane from El Rancho Drive to McCarran Blvd. from April 2021 to October 2021.

    Local homes and businesses will still have access, however through traffic will need to use El Rancho Drive or another alternative route.

    Roadwork will also be completed on El Rancho Drive and McCarran Blvd.

    a map showing the road construction

    Sullivan Lane: Sullivan Lane will be closed to all traffic from El Rancho Drive to Green Vista Drive. Access to the residences west of Sullivan Lane will be from El Rancho Drive and Divot Drive.

    The section of Sullivan Lane from Green Vista Drive south to McCarran Blvd. will be closed to through traffic, however local access will be permitted to enter and exit the Wildcreek Golf Course and the Wildcreek Business Park. Residents who live off of Green Vista Drive will have access.

    The section of Sullivan Lane south of McCarran Blvd to Wedekind Road will remain open but will have minor road improvements made.

    McCarran Blvd: The northbound turn lanes from McCarran Blvd. onto Sullivan Lane will be closed some evenings for night work.

    El Rancho Drive: El Rancho Drive from Sun Valley Blvd. to Sullivan Lane will be intermittently narrowed to one lane as work is done on the street. It will remain open for traffic. 

    All road construction has been approved by the City of Sparks.

    To download a larger map of the area, click here.  

     

    The final product

    The end result will be a safer Sullivan Lane, El Rancho Drive, and McCarran Blvd. in preparation for the additional traffic the neighborhood will see when Procter R. Hug High School opens in August 2022. A roundabout will be added at the intersection of El Rancho Drive and Sullivan Lane and another roundabout will be added closer to the entrance of the school on Sullivan Lane. These roundabouts will help create a safer environment for students commuting to school. Sidewalks will also be added the entire length of Sullivan Lane, including south of McCarran down to Wedekind Road.  Additionally, sidewalks will be added to El Rancho Drive for safety.

     

     

    Próxima construcción de carreteras a partir de abril del 2021

    Como parte de la construcción de la nueva escuela Procter R. Hug High School, nuestros contratistas harán mejoras de seguridad en Sullivan Lane. Esto resultará en el cierre de una parte de Sullivan Lane desde El Rancho Drive hasta McCarran Blvd. desde abril del 2021 hasta octubre del 2021.

    Los hogares y las empresas locales seguirán teniendo acceso, sin embargo, el tráfico público que pasa por allí deberá utilizar El Rancho Drive u otra ruta alternativa.

    Las obras viales también se completarán en El Rancho Drive y McCarran Blvd.

    Detalles sobre las obras viales: qué esperar e información sobre los desvíos

    Sullivan Lane: Sullivan Lane estará cerrada a todo el tráfico desde El Rancho Drive hasta Green Vista Drive. El acceso a las residencias al oeste de Sullivan Lane será desde El Rancho Drive y Divot Drive.

    La sección de Sullivan Lane desde el sur de Green Vista Drive hasta McCarran Blvd. estará cerrado al tráfico, sin embargo, se permitirá el acceso local para entrar y salir del campo de golf Wildcreek Golf Course y del Wildcreek Business Park. Los residentes que viven cerca de Green Vista Drive tendrán acceso.

    La sección de Sullivan Lane al sur de McCarran Blvd hasta Wedekind Road permanecerá abierta, pero se realizarán mejoras menores en la carretera.

    McCarran Blvd: Los carriles de giro en dirección norte desde McCarran Blvd. en Sullivan Lane estarán cerrados algunas noches para trabajar por la noche.

    El Rancho Drive: El Rancho Drive desde Sun Valley Blvd. a Sullivan Lane se reducirá intermitentemente a un carril a medida que se realiza el trabajo en la calle. Permanecerá abierto al tráfico.

    Toda la construcción de carreteras ha sido aprobada por la Ciudad de Sparks.

    El producto final

    El resultado final será un Sullivan Lane más seguro, el Rancho Drive y McCarran Blvd más seguros. en preparación para el tráfico adicional que verá el vecindario cuando la escuela Procter R. Hug High School se abra en agosto del 2022. Se agregará una rotonda en la intersección de El Rancho Drive y Sullivan Lane y se agregará otra rotonda más cerca de la entrada de la escuela en Sullivan Lane. Estas rotondas ayudarán a crear un entorno más seguro para los estudiantes que viajan diariamente a la escuela. También para seguridad, se agregarán aceras a todo lo largo de Sullivan Lane, incluyendo el sur de McCarran hasta Wedekind Road. Además, se agregarán aceras adicionales a El Rancho Drive.

Quick Facts

    • Location: 3530 Sullivan Lane, Sparks NV 89431 
    • Architect: H+K Architects 
    • Contractor: Clark/Sullivan Construction 
    • Capacity: 2,200 students
    • Cost: $252.72 million approved by the Board of Trustees